10212018Sun
Last updateFri, 19 Oct 2018 1pm

i

End-User News

Tallgrass Developing New Pipeline and Liquids Terminal

Tallgrass Energy, LP plans to develop a new crude oil pipeline from Cushing, OK to the St. James, LA refining complex, as well as a separate new export-capable liquids terminal strategically located near the mouth of the Mississippi River.

The proposed Seahorse Pipeline is expected to be 30 inches in diameter and approximately 700 miles long, with the capacity to transport up to 800,000 barrels of crude oil per day from Cushing to the Louisiana Gulf Coast. The proposed new terminal, Plaquemines Liquids Terminal is expected to be fully operational in 2Q 2020 and is permitted for up to 20 million barrels of storage. 

Subscribe Fall18

FREE SUBSCRIPTION*

• Print magazine
Digital magazine
• VALVE eNews
Read the latest issue

*to qualified valve professionals in the U.S./Canada

Looking for a career in the Valve Industry?

ValveCareers Horiz

To learn more, visit the Valve Careers YouTube channel to watch the videos below or visit ValveCareers.com a special initiative of the Valve Manufacturers Association

  • Latest Post

  • Popular

  • Links

  • Events

New Products