04042020Sat
Last updateFri, 03 Apr 2020 8pm

Valve Manufacturing

Metso Supplies Calcining System to Russia

Metso has signed a contract for the delivery of a calcining system to a customer in Russia. The order’s value is approximately $32 million. Commissioning of the system is expected to take place in 2023.

The system, which consists of two calcining lines with a total capacity of 420 000 tons annually, has been designed to remove moisture and volatile substances and improve the product’s physical and chemical features. Both lines feature a rotary kiln, an afterburner and a rotary cooler. Automation, control and additional systems are also included in the delivery.

Subscribe VMWNT20FREE SUBSCRIPTION*

• Print magazine
Digital magazine
• VALVE eNews
Read the latest issue

*to qualified valve professionals in the U.S./Canada

Looking for a career in the Valve Industry?

ValveCareers Horiz

To learn more, visit the Valve Careers YouTube channel to watch the videos below or visit ValveCareers.com a special initiative of the Valve Manufacturers Association

  • Latest Post

  • Popular

  • Links

  • Events

New Products