Published May 19, 2020
The impact of a facility’s decision to repair control valves, versus replacing them, in the coming months could result in more effort, time and money than expected.
By Jason Ordanoff
Facilities typically schedule outages, turnarounds or shutdowns to repair or replace equipment like control valves. They coordinate these scheduled shutdowns to allow for preventative maintenance (PM). During this time, the facility removes the control valves to allow for the inspection and evaluation of potential damage or issues.
The PM may require certain control valves to be evaluated for repair at certain frequencies (annually, bi-annually, etc.), whether there are any known issues or not. In addition, any identified “troublesome” valves, will be pulled for evaluation. The time frame for being shut down can range from days to weeks or a month. It is vital, from a profitability aspect, to have the process go smoothly and everything be up and running on time.
The potential for risk is great during the process of repairing control valves. Risks may include:
Once “non-essential” and “essential” businesses, as classified by the COVID-19 crisis, return to full production, there could be additional risks, such as backlogs on parts and service from manufacturers. Because of the increase in demand, there could be a shortage of skilled labor available to do this work. This will cause delays and possibly even safety risks if “unskilled” labor is used to get the work done. All of these risks can significantly impact the cost of the repair.
Let us look at a hypothetical valve repair. Assume there are 40 control valves requiring repair at an estimated $2,500 per valve. This results in a $100,000 repair quote. The valves will be returned to the facility after being repaired, in partial shipments with a three week promised delivery date. The alternative was to replace all 40 control valves at a known cost of $200,000. The facility decides to save half the cost of buying all new control valves by repairing all of them. This 50% thumb-rule is quite commonly used to determine if a repair or replacement is required. If the cost of repair is less than 50% of replacement cost, the decision might be made to go with repairing the valves. However, the reality is that once the control valves are inspected, the discovery work (additional repairs/parts needed) typically can add an additional 40% to the initial quote. Let’s assume a three-day delay; this will cost the facility in overtime paid and production loss. So if we only add a 10% increase to the initial quote due to the delay, the numbers are now 50% more cost which equates to $150,000 versus the initial $100,000 to repair the valves.
So now the hard questions: “Did we really save money?”, “Did we start up on time?” and “What was the cost of our lost production?” are being analyzed by the facility. Note that there could be even greater costs due to delays and other factors, again due to the current COVID-19 situation, as previously mentioned.
The advantages of repair by replace are many, given that the real cost may not be that much more than repairing the valves.
Another added benefit could be the ability to upgrade valves’ positioners to smart digital positioners. This kind of positioner provides diagnostic capabilities that enable predicting maintenance needs. This eliminates the guesswork in determining which control valves to evaluate, saving time, effort and cost.
Another benefit of “repair by replace” would be the option of upgrading to low-emissions packing to reduce fugitive emissions to the surrounding environment.
Yet another advantage might be to replace valves with different types that still do the job. For example, a reciprocating globe valve could have a drop-in replacement that is a rotary control valve (Figure 3). The replacement valve would offer smaller size, half the weight, lower cost, fewer leakage paths and a smaller number of spare parts.
There are many benefits to repair by replace. This scenario eliminates a significant amount of time, effort and cost that would not be obvious from just looking at the quote for repairing the valves. In addition, the facility will have added value by upgrading the control valves and has the reassurance of a warrantied new control valve to ensure the facilities critical process control is well maintained for years to come. On top of that, this approach means no unplanned downtime and resulting loss of production.
This whole process can be made easier by partnering with control valve experts, such as manufacturers reps. Many stock a comprehensive inventory of control valves, positioners and actuator types and are able to provide the needed configurations. In addition, some offer services to support facility PM shutdowns, including surveying existing valves to determine which need replacement, and repair and/or installation.
During normal times, the cost of repair versus replacement may initially look inviting and seem reasonable. However, during the COVID-19 crisis these are not normal times. Even under ideal conditions, the actual cost of repair frequently exceeds the original estimate and repair always requires the valve be shipped to the repair company. Add to this the complications caused by the pandemic, such as shipping delays and backordered spares, and replacement may be preferable. To make the right decision, pay careful attention to all the factors involved, not just the repair itself. In many cases, the decision to “repair by replace” can significantly reduce a facility’s time, effort and costs, especially during the current uncertain business climate.
Jason Ordanoff is business development manager with Eastern Controls Inc. and has over a decade of experience providing control valve solutions to customers in all industries.
Why engineered mounting kits are critical to valve automation integrity.
April 7, 2026
Simple automations can create big gains on the shop floor.
April 3, 2026
Prevention can help operators avoid system damage and shutdowns.
March 30, 2026